Pages

Search

Microsoft Word - Word 2010 Accepting tracked changes, but retaining Comments?

Microsoft Word - Word 2010 Accepting tracked changes, but retaining Comments?


Word 2010 Accepting tracked changes, but retaining Comments?

Posted: 14 Mar 2013 07:13 PM PDT

Hi, I have a large marked up policy document. I wish to accept all the changes, but retain the Comments. When I accept all the changes, it removes the Comments. Any suggestions gratefuly received. I am currently working in Word 2010, but am working on a 2003 document which will need to ultimately remain in 2003 format  Thanks.

Ciick to run updates

Posted: 14 Mar 2013 02:28 PM PDT

I have an activated copy of office 2013 professional plus. My click to run update version is stuck at version 15.0.4481.1005. I tried the repair on line feature to no avail..My office update is set to automatically download updates but it is not working.Any help would be appreciated. Gilles C

Error with email attached Word document

Posted: 14 Mar 2013 12:37 PM PDT

Whenever I open a Word document that is an email attachment (Windows Live Mail 2011), I get an error message that Word cannot open because a dialog box is open. The only dialog box open is the one with the error message. When I close it, the document opens without problems. Is this a bug or is there a fix?

Word 2013 typing/editing question

Posted: 14 Mar 2013 11:41 AM PDT

Word 2013 won't let me drag and drop text. I checked under Options, Advanced, and the box for the "drag and drop" option is already checked. Any ideas why it's not working?

How do you get a watermark to appear on a copy

Posted: 14 Mar 2013 05:23 AM PDT

I have created a BOL with a watermark on it.  When I make copies, the watermark is not visible.  Is there a way to create a watermark that will show up on a copy?

Is it possible to automatically trigger my autocorrect options in documents created on other computers?

Posted: 14 Mar 2013 04:18 AM PDT

In Office 2010, is there a way to trigger autocorrect on a document that someone on a different computer has created? I handle the registrations for an annual convention, and those registrations use special codes for different events. I have my autocorrect set up to expand those codes into the full name of an event. I'd like to be able to generate that text automatically in the registrations that others send me, without paging through each document.

File conversion help!

Posted: 13 Mar 2013 07:43 PM PDT

I have MS Office Word 2007 and recently installed Windows updates. Since then when I open documents created in earlier versions, the document (ex. 2003), it does not convert to a 2007 document.  Also, every time I initially open Word, it goes through the configuration process. I've restarted my computer and this has not fixed either issue. Help!

Word opens without a document

Posted: 13 Mar 2013 06:49 AM PDT

This morning I installed a number of updates, mostly to Windows 7 and Office 2010. Perhaps it's just coincidence, but when I click on any of the documents (either Pinned or Recent) on the Taskbar jump list for Word 2003, a new instance of Word opens without any document, much less the one I clicked on. Luckily my Work menu is still working, but the two lists don't entirely overlap. When I click the X to close the empty Word window, I get the "Changes have been made to the Normal template..." prompt (entirely without cause). I decline to save it, and the Word window closes, leaving the original instance of Word still open. I've come to depend on the jump list, so this is very distressing.

 

The problem seems to be confined to Word: jump lists for Excel 2003, Publisher 2003, Word 2007, Word 2010, and IE 9 still work as expected.

FC2, Dell, and SoundMAX audio - Forums Linux

FC2, Dell, and SoundMAX audio - Forums Linux


FC2, Dell, and SoundMAX audio

Posted: 05 Jun 2004 12:42 PM PDT

Allen Kistler wrote: 

Hmmm... CD audio still doesn't work in Linux, no matter what I do to
any mixer channel (either mixer).

Problems with FLOCK (file lock)

Posted: 05 Jun 2004 09:29 AM PDT

-----BEGIN PGP SIGNED MESSAGE-----
Hash: SHA1
NotDashEscaped: You need GnuPG to verify this message

In comp.os.linux.setup Fatih Gey <de> suggested: 
[..]
 
 

Strange, but then use 'diff' (man diff) and check the difference
to the .config from the fedora kernel to get more info what you
are missing.

Good luck

--
Michael Heiming (GPG-Key ID: 0xEDD27B94)
mail: echo qr | perl -pe 'y/a-z/n-za-m/'
-----BEGIN PGP SIGNATURE-----
Version: GnuPG v1.2.1 (GNU/Linux)

iD8DBQFAwh73AkPEju3Se5QRAvvJAJ0aY5/XmCMlz37bszBZCvuRYfZbwACfbFw7
pfAMiLY6vj2V3lU0ZsyNspE=
=ajfX
-----END PGP SIGNATURE-----

Procmail - GPG , forward an encrypted mail.

Posted: 05 Jun 2004 04:40 AM PDT

If i use () in the gpg line i get some error in the
procmail log , and other related to the () in formail line.
---
(gpg: (gpg: No such file or directory
procmail: Error while writing to "(gpg"
procmail: Rescue of unfiltered data succeeded
Folder: (formail -I"To: it" -I"Mime-Version: 1.0" \
---

the mail is sent but in this case i have no body message.

without () this is an example of a message that i receive :

----
email server headers etc etc ..

To: com
Mime-Version: 1.0
Content-Type: multipart/encrypted; protocol="application/pgp-encrypted";
Content-Disposition: inline

-----BEGIN PGP MESSAGE-----
Version: GnuPG v1.0.6 (GNU/Linux)
Comment: For info see http://www.gnupg.org

crypted message
-----END PGP MESSAGE-----
----

i found a post on google http://tinyurl.com/2mg3x with a similar problem,
there is a script but i don't understand how to use it in this case and how
to integrate it in .procmailrc.
i tried :
:0fw
|script com
:0
! email address.com
but don't work.

Bye


Alan Connor wrote:
 

From Windows to Linux Server?

Posted: 05 Jun 2004 03:20 AM PDT

Thomas wrote: 

I do not know what you are talking about. In this context, what is a
signature? Have you looked at iptables?
 

My iptables firewall is based on one in "Red Hat Linux Firewalls" by Bill
McCarty, published by redhat PRESS, Chapter 10.


--
.~. Jean-David Beyer Registered Linux User 85642.
/V\ Registered Machine 241939.
/( )\ Shrewsbury, New Jersey http://counter.li.org
^^-^^ 23:40:00 up 5 days, 8:39, 5 users, load average: 11.88, 11.99, 11.38

Kernel question

Posted: 04 Jun 2004 06:41 PM PDT

Valeriu Catina <de> writes:
 

Look into /proc/cpuinfo.

Vilmos

How can I install Linux on a portable computer

Posted: 04 Jun 2004 10:27 AM PDT

ZW wrote: 

See what others have installed:

http://www.linux-on-laptops.com
http://www.linux-laptops.org
( http://tuxmobil.org/centrino.html )

Read also:
http://www.futuredesktop.org/how2burn.html

---------

Mandrake 10 Linux is very good.
Learn to use the package/installation tools.

Knoppix is OK, you can run directly from a CD.
Alternatively install it on a HD.

Or go for Xandros Linux. It costs a few $.
http://www.xandros.com/


// moma

LDAP as standard authentication

Posted: 03 Jun 2004 03:50 PM PDT

The world rejoiced as "Sarah Tanembaum" <com> wrote: 

Not likely. Setting up authentication against an LDAP server requires
some extra, somewhat fiddly, configuration, and it usually makes sense
for systems to use /etc/passwd by default, with resort to NIS/LDAP
being something a system administrator sets up _afterwards_.
--
output = ("cbbrowne" "@" "ntlug.org")
http://www3.sympatico.ca/cbbrowne/
"Microsoft has world class quality control" -- Arthur Norman

Trying to get sound to work on Fedora Core 2

Posted: 03 Jun 2004 03:47 PM PDT

On Fri, 04 Jun 2004 17:52:44 +0000, Chiefy typed furiously: 

But not the cut and paste apparently. :-)

--
I had to hit him, he was beginning to make sense.

Boot Partiotion too big-Errror within Installation

Posted: 01 Jun 2004 12:13 AM PDT

Holger Stein wrote: 
Sounds like your distro ("a CD with Go!Linux 7.2 and used the
installation-programm of this system.") is defective. Why not try some
other distro?

Any competant distro has fdisk (or something similar, or a choice of many:
Red Hat has what they call a "Disk Druid" but you can use fdisk as well)
that will leave existing partitions alone and allow you to make all the
Linux, swap, and whatnot partitions you want in the remaining available space.

--
.~. Jean-David Beyer Registered Linux User 85642.
/V\ Registered Machine 241939.
/( )\ Shrewsbury, New Jersey http://counter.li.org
^^-^^ 06:55:00 up 4 days, 15:54, 5 users, load average: 4.37, 4.26, 4.12

Summary Task showing duration Microsoft Project

Summary Task showing duration Microsoft Project


Summary Task showing duration

Posted: 14 Jun 2004 07:37 AM PDT


Cheryl,
That's a simple one. There are 9 working days from 6/21/04 to 7/2/04.
The duration of a summary line is simply the difference in working time
between the earliest start date and the latest finish date of the
subtasks under the summary.

Hope this helps.
John

Resources/Projects View?

Posted: 13 Jun 2004 03:46 PM PDT

David --

If you are using Project Professional 2003 with Project Server, you could do
the following:

1. Open a new blank project
2. Use the Build Team from Enterprise wizard to select the resources whose
projects you wish to see
3. Save the project as an enterprise project in the Project Server database
4. Apply the Resource Usage view

The Resource Usage view will now show each resource, along with each project
to which the resource is assigned. Hope this helps.

--
Dale A. Howard [MVP]
Enterprise Project Trainer/Consultant
http://www.msprojectexperts.com
"We wrote the book on Project Server"


"davegb" <com> wrote in message
news:google.com... 


Deadlines and Constraints

Posted: 13 Jun 2004 01:20 PM PDT

Hi Dave,
I'd use "Finish No Later Than"
It is better than "Must Finish On" - reality is that finishing early is
definitely allowed :-)
However, beware, as I said, Project will then always show a "good" date for
the finish of the final task.
Personally, I include a column "Total Slack" which is your buffer and
becomes negative as soon as you're late versus the due date.
HTH

--
Jan De Messemaeker
Microsoft Project Most Valuable Professional
http://users.online.be/prom-ade/index.htm
32-495-300 620
"DaveN" <microsoft.com> schreef in bericht
news:com... 
no tomorrow. And in order for our executives review proposals before they
are submitted, I must establish hard review dates. My question is then, How
do I tell Project that these particular dates cannot float? I don't care
about resource units or work. I have to set certain dates. These projects
are controlled by the end date. 
successor 
start 
column 
are 


Team Member User Permission Setttings for Server config

Posted: 12 Jun 2004 05:31 AM PDT

Yes, that's one that I did not specifically list.



"Dale Howard [MVP]" <dale(dot)howard(at)msprojectexperts(dot)com> wrote in
message news:phx.gbl... 
from 
within 
set 
Projects 
is 
in 
understanding 


Setting task duration to minimum number of days

Posted: 12 Jun 2004 12:49 AM PDT


Richard,
I apologize for a slight error in my earlier post. For the macro
approach, the code needs to find the delta duration from task start to
the end of the first day if the Start time is later than 8:00:00. This
fractional day duration should then be added to the nominal 3 day
duration. No change is made to the Start time because everything is set
by the modified Duration.

John

Assigning groups

Posted: 11 Jun 2004 05:14 PM PDT

HI,

In the assign dialog box you can select multiple resources (hold the Ctrl
key down, then drag them all together onto one or more tasks. In addition
you can copy the contents of the Resource Names column to other tasks so
duplicating the assignments. This is especially useful if you have different
people at different units.

--
For VBA posts, please use the public.project.developer group.
For any version of Project use public.project
For any version of Project Server use public. project.server

Rod Gill
Project MVP
For Microsoft Project companion projects, best practices and Project VBA
development services
visit www.projectlearning.com/
"Rob Schneider" <net.net> wrote in message
news:phx.gbl... 
names again and again when a group name fits different groups of people....
MircoSoft... PLEASE add this functionality... it IS important for
scheduling. (and not driving PMs crazy) 
the 
sorry" 


Tasks that require multiple resources at the same time

Posted: 11 Jun 2004 02:32 PM PDT

It IS the best solution, Julie.
But for a longish workaround through leveling, it is the ONLY solution.
Greetings,

--
Jan De Messemaeker
Microsoft Project Most Valuable Professional
http://users.online.be/prom-ade/index.htm
32-495-300 620
"JulieD" <net.au> schreef in bericht
news:unsw#phx.gbl... 
calendar 

per 
days 
both 


Editing hours in Usage Views

Posted: 11 Jun 2004 06:41 AM PDT

Hi,

Well yes, you can do that, and you can enter remaining work for each of the
assignments, no problem.
My question was why stop Project from rescheduling the remaining work?
Note: if you enter reemaining work for both assignments, Project will not
recalculate that, but it may reschedule it (not the same thing)
HTH
--
Jan De Messemaeker
Microsoft Project Most Valuable Professional
http://users.online.be/prom-ade/index.htm
32-495-300 620
"Mani" <microsoft.com> schreef in bericht
news:com... 
for each task for each week. Every week I am given an update of the Actual
Work and sometimes, an adjustment of the remaining work. However, if I have
2 or more resources assigned to a task, I find that the work may not be
distributed correctly. For example a task that is estimated for 40 hours
may require Jim to be assigned for 30 and Jane for 10, but may actually be
20/20. The only way that I have figured so far to do this is by updating it
manually in a Time Scaled Task or Resource usage view... Any suggestions?


Project Training?

Posted: 11 Jun 2004 04:06 AM PDT

If you look around on the net, you may still be able to find a set or
the Keystone Learning Systems CD's on Project. Unfortunately, we only
did up through Project 2000. There is almost 8 hrs of material on
these CD's, and they are very thorough. I know, because I did them.
They would probably still help someone new to project considerably.
They are not just "push button" instructions, but contain quite a bit
of information about Project Management based on my experience as a PM
and PM consultant for a combined 20 years.
The first couple of hours are an introduction to Critical Path
Scheduling, something I feel you have to have passing knowledge of to
properly use MS Project (or any other scheduling software). There's a
lot of good stuff in them.
Best of luck.

David G. Bellamy
Bellamy Consulting