Pages

Search

Microsoft Word - Saving Word Docs on IPad to ICloud

Microsoft Word - Saving Word Docs on IPad to ICloud


Saving Word Docs on IPad to ICloud

Posted: 08 Mar 2015 03:41 PM PDT

I have a new Ipad with Word downloaded on it. Documents are automatically saved to One Drive - wherever that is - but I would like to save them to ICloud so that I can access them and vice versa from my desktop. I can't find a way to Duplicate to I-Cloud, which seems silly, since the new Word app is specifically for the Ipad. What am I missing?

Word 2010 macros using search-and-replace work only in text or in footnotes, not both at once

Posted: 08 Mar 2015 01:33 PM PDT

When I create a macro that uses a search-and-replace (literal or wildcard) operation, the macro works only in the text or only in the footnotes, wherever my cursor happens to be when I run it. How can I make the macro run in both the text and the notes simultaneously?

Adding to an existing list

Posted: 08 Mar 2015 12:00 PM PDT

Hello,

         I have created a document in Open Office. One for the players in my golf league and the other for a sub list. Today I tried to add names to that list and I was not able to get the cursor to the spot under the last name to add another. I just want to be able to add or delete names. Thank-you for any help.

                         ohputter

Certain sections of text change when Word is opened or closed.

Posted: 08 Mar 2015 11:51 AM PDT

Help!  I'm editing a document for a friend.  I believe they have a Mac while I have a PC, so this may be the root of the problem.  I'm just not sure what to do.  When I close the document and then reopen it, some sentences have changed.  The font size is usually smaller (10 instead of 12), is in bold, and in all caps.  I correct the sentences, close out Word, and then open the document again and they've done this again!  Sometimes there are additional areas that are messed up too.  This keeps happening over and over. 

Word - Insert Object Tool - Adobe

Posted: 08 Mar 2015 08:29 AM PDT

I have an issue trying to finish a document. I have Insert-Object-adobe pdf into a word document to save space in the appendices. Readers can double click on an object image to open the entire document in adobe. Now I am trying to save the entire word document as a pdf and the embedded pdf now does not work. The new document has flattened the embedded pdf and it doesnt open anymore. I tried Save and Send command as well using the pdf/xps command and that also fails. Is there any way to use that feature of word 2010 to insert the object. and then to be able to save the entire file as a pdf?? 

Very useful to insert the document. saves a lot of space in the appendices

Microsoft equation editor 3.0

Posted: 08 Mar 2015 07:00 AM PDT

I use Microsoft  2007 and  I have a problem when I use the Microsoft equation editor. When I type an equation many mathematical symbols ( { ,-, ] ;.....) do not appear on my screen. This problem is not related to the version of Microsoft office that I use because this problem doesn't occur in another PC with the same version. If it is related to the editor itself, How can I uninstall it.

How to create a dictionary for an unsupported language in Word

Posted: 08 Mar 2015 04:36 AM PDT

The custom dictionary is an addendum to the main one, that is, it refers to a language that already exists. But what if I want to add a new dictionary for a language that is not listed by Word?

WORD "disappeared" from my Dell

Posted: 08 Mar 2015 03:11 AM PDT

I purchased MS Word with my Dell computer when I ordered it online. It worked fine for a while and then the program just disappeared. I did not lose any saved work, and the WORD icon is still present. When I click on the icon though, it takes me to a screen where I have the option to buy WORD or if I have a 25 character key or active MS account I can "sign in" or use the key to access WORD, but I don't have the key. The only MS account I have is for XBox, and it won't accept that.

Has anyone encountered this? Any suggestions?

Microsoft Word 365 not responding, locks document

Posted: 07 Mar 2015 04:51 PM PST

When creating a Word document in 365 the application freezes and I have to force it closed. Upon reopening, the document is locked "In use by another user". This requires a reboot to access the document again. Anyone out there know what's going on with this? I've had so much trouble with 365 I'm about ready to ask for a refund. I have to get my work done and cannot continuously reboot.

How to disable NIS in Linux - Forums Linux

How to disable NIS in Linux - Forums Linux


How to disable NIS in Linux

Posted: 09 Nov 2009 02:34 PM PST

On Nov 9, 7:25pm, BBH <com> wrote: 

It looks you've disabled NIS. What does "ypwhich" say? And What
happens if you delete the account and attempt to re-add it? And is /
home perhaps NFS mounted, with root permissions disabled, which would
block "useradd" from creating accounts?

Framebuffer on a modern graphics card?

Posted: 08 Nov 2009 01:54 PM PST

Aragorn wrote:
 

I have not seen the problems that "others report".

I use ATI an currently have a 4670HD, works flawlessly with the radeon,
radeonhd driver or catalyst drivers.

No problems.

Error when installing the latest nvidia driver on Ubuntu 9.04

Posted: 31 Oct 2009 09:02 AM PDT

On Sat, 31 Oct 2009 18:15:48 -0500, John Thompson
<os2.dhs.org> wrote:
 

You were absolutely right! There were old drivers and symlinks to them in
/lib32 and /lib32/tls. I manually removed the files and the installation
went without problems. 32 bit support (Google Earth) works fine. Thank you!

--
//ceed

Trouble with non-ASCII characters over SSH. Help, please!

Posted: 30 Oct 2009 01:01 PM PDT

* Unruh <ubc.ca>: 

Agreed except ssh might be part of the solution, explained below.
 

There are ssh configuration options for client and server for passing on
environment variables. I was thinking of this earlier having recently
read about it in another discussion but could not clearly recall it at
the time of my reply

Quoting ssh_config(5):

SendEnv
Specifies what variables from the local environ(7) should be sent
to the server. Note that environment passing is only supported
for protocol 2, the server must also support it, and the server
must be configured to accept these environment variables. Refer
to AcceptEnv in sshd_config(5) for how to configure the server.
Variables are specified by name, which may contain the wildcard
characters '*' and '?'. Multiple environment variables may be
separated by whitespace or spread across multiple SendEnv direc-
tives. The default is not to send any environment variables.

Quoting sshd_config(5):

AcceptEnv
Specifies what environment variables sent by the client will be
copied into the session's environ(7). See SendEnv in
ssh_config(5) for how to configure the client. Note that envi-
ronment passing is only supported for protocol 2. Variables are
specified by name, which may contain the wildcard characters '*'
and '?'. Multiple environment variables may be separated by
whitespace or spread across multiple AcceptEnv directives. Be
warned that some environment variables could be used to bypass
restricted user environments. For this reason, care should be
taken in the use of this directive. The default is not to accept
any environment variables.

--
James Michael Fultz <as.invalid>
Remove this part when replying ^^^^^^^^

Linux / UNIX Distributions VAIO Laptop Installation

Posted: 28 Oct 2009 12:37 AM PDT

On Oct 28, 2:37am, "com" <com>
wrote: 

Download and burn an iso of the new Ubuntu live CD.
Boot from it and check to see if video, network, sound etc work.
If they do then install it.

Richard Stallman On FOSS GNU And Freedom

Posted: 24 Oct 2009 01:06 PM PDT

On Sunday 25 October 2009 03:46 in comp.os.linux.setup, somebody
identifying as Nico Kadel-Garcia wrote...
 

The OP would probably raise more of an interest if he had posted it to
gnu.misc.discuss, but then again, the OP uses Google Groups as a User
Agent and multiposts, so I guess that says enough... ;-)

--
*Aragorn*
(registered GNU/Linux user #223157)

working directory

Posted: 22 Oct 2009 07:00 AM PDT

The Natural Philosopher wrote:
 

The OP stated they didn't need the data on the mounted directory, so
everyone's mention that they are ed until they copy data is
probably not correct. Anyway, if a forced umount doesn't do the trick,
as others have mentioned, you need to put in a new USB stick and then
umount it. Then restart MySQL.
--
Not really a wanna-be, but I don't know everything.

reliability of monitoring tools

Posted: 19 Oct 2009 07:44 AM PDT

Thanks, it helped me to understand the process of CPU-Monitoring a little
bit better.
Jacob

"Sidney Lambe" <invalid> schrieb im Newsbeitrag
news:net... 


Can someone help me with permissions please.

Posted: 19 Oct 2009 03:34 AM PDT

Dave wrote:
 

What are the permissions on the /home/dave directory itself? Likely
Apache doesn't have permissions to access the main account root
directory. Anyway, consider using SuEXEC CGI wrapper if this is a
system other users have access to run PHP or CGI scripts on. If not,
then it's safer to keep it as the global Apache user like you have it
now. And, no, chmod 0602 will not give permission on a directory, even
if the owner is set to the Apache user. For a file it would work at
600, if it's the right owner (read and write), but directories need to
be higher (700 at least, if it's the same user for read, write and
create access).
--
Not really a wanna-be, but I don't know everything.

Quicker access to "More Views.." selections? Microsoft Project

Quicker access to "More Views.." selections? Microsoft Project


Quicker access to "More Views.." selections?

Posted: 22 Feb 2006 06:42 AM PST

To add a tool bar of views: View>View Bar
For the view to be visable in the tool bae you'll need to follow Jan's
suggestion first.

"Pat" wrote:
 

Week Ending not Week Begining?

Posted: 22 Feb 2006 03:00 AM PST

I am always confused when I see date ending weeks. But you might look at
Tools>Options>Calendar and chanege the Week Starts On. I've never changed
this from Sunday so good luck.

"tbardlse" wrote:
 

% Completed vs. % Estimated

Posted: 21 Feb 2006 10:56 PM PST

Absolutely, Rod. A more basic item that many Newbies shol dunderstand is the
dofference between % Complete and % Work Complete. In your explaination of
updating the Duration, versus updating the Work, the two different fields
will soon "go out of alignment" with one another. It confuses many people
when they don't understand that:

% Complete - tracks progress through the task's DURATION
% Work Complete - tracks progress toward completion of WORK

There is also a third field called "Physical % Complete". it is an
alternative field that can be used to calculate BCWP for EVM. The
description of this field and recommended use is clearly described in the PSm
2003 Help files.


--
RTucker, PMP


"Rod Gill" wrote:
 

How do I create a time-phased budget in MS project?

Posted: 21 Feb 2006 09:12 PM PST

In article <com>,
corina <microsoft.com> wrote:
 

corina,
Some might say that the Baseline Cost field is the budget but it kind of
depends on how you view a "budget".

I suggest you set up your plan complete with resources. The original
estimated cost will be the Cost field and this would be treated as the
budget. When it is all set up, go to Tools/Tracking/Save Baseline and
save a baseline for the entire project. Project then captures all the
data in the Cost field and saves it in the Baseline Cost field so it can
be used for earned value calculations or any other comparative ysis.

Hope this helps.
John
Project MVP

Question mark in Task Duration

Posted: 21 Feb 2006 05:21 PM PST

In article <googlegroups.com>,
com wrote:
 

Cole,
You're welcome.
John

MS Project Standard Compatibility

Posted: 21 Feb 2006 03:56 PM PST

Thank you Rick

"Rick Roszko" wrote:
 

Why does an 8 hour day start on 1 day and finish on the next?

Posted: 21 Feb 2006 12:11 PM PST

Thanks for the reply. I figured out what I was doing wrong. It has to do
with some people working an 8 hour day and some people working a 6.4 hour day
on the same calendar. I just messed up the time allocation so that it always
seemed to just be over 1.00 days of work.

Thanks anyway.

Roadrawts


"Gilgamesh" wrote:
 

setting up cost per hour

Posted: 21 Feb 2006 12:07 PM PST

Thanks for you feed back. I added the column like you said. I'm not really
sure what the deference is between work, actual work is. I guess work is how
much I have and actual work is how much can be done?. I'm still not clear on
setting up cost for work being done.

"Rick Roszko" wrote:
 

resources instead of tasks

Posted: 21 Feb 2006 10:39 AM PST

Hi,

Will the Resource sheet view not give you what you are looking for? This
view groups tasks by resource and shows the hours being worked on each task
each day.

Hope this helps

Regards

DavidC

"kotoman" wrote:
 

Using Project for manufacturing

Posted: 21 Feb 2006 09:29 AM PST

The great advantage Project has for Custom manufacturers is distributed (web kiosk)
task sheets and status updates in the Server version. Many full scale Manufacturing ERP systems
don't even include this, while some can achieve it via bar scanning as a data colection point. Custom often
means a whole lot of unknows (and worse cowboys running through your plant playing hero to keep their customers happy,
and everybody else) so if you can find out the reality of your present situation you can make good scheduling
decisions with bottom line company wide impact of those decisions.
An offshoot of capturing the ebb and flow of work on the shop floor is that with a simple coding system, any cost
evaluation is a data query away. This can blend with existing process/material/production/sales systems already in place.

Job A had 5 hours framing-2 hours finishing-1 hour packing. This is a simple audit after the production of Job A has been completed.
This then becomes your actual hours vs. quoted hours(revenue or operational)....mix that with the materials per Job A and voila,
done.
All enabled by real time recording of actuals from the shop floor on
task completion,
task change,
end of shift.

The closer you can get to real time status the more accurate and better performance the shop will have
because true limits to production are easy to spot. This discipline lets cost calculations be a non issue.
Just go use the information you had to gather anyway in order to time the events of transforming "materials and work" into
"product:"

So Project does the same thing as Project server, you would just need a way to record the actual status of the shop floor
and get it into the files. (Clipboard and running shoes come to mind).


"John" <com> wrote in message news:microsoft.com... 


Is there a Wizard in Project 2000 that reviews the schedule

Posted: 21 Feb 2006 08:20 AM PST

Hawnp --

I believe the QuantumPM Schedule Auditor is the tool you are describing:

http://www.quantumpm.com/qsa.aspx

Hope this helps.

--
Dale A. Howard [MVP]
Enterprise Project Trainer/Consultant
http://www.msprojectexperts.com
http://www.projectserverexperts.com
"We wrote the book on Project Server"


"Hawnp" <microsoft.com> wrote in message
news:com... 


Schedule Template w/ Customized Sub Menu's

Posted: 21 Feb 2006 08:00 AM PST

Which option would you like me to comment on?
I have experience with all of them.

--
Jan De Messemaeker, Microsoft Project Most Valuable Professional
http://users.online.be/prom-ade/
For FAQs: http://www.mvps.org/project/faqs.htm
"VSAT Ryan" <microsoft.com> schreef in bericht
news:com... 
them 
to 
company 
created 
is 
creating 


How do I outdent tasks that are indented (Project 2003)

Posted: 21 Feb 2006 02:41 AM PST

Moderator,

please close/delete this thread since it a duplicate.

Thanks.
Kav.



"kav" wrote:
 

Duration of task & subtask, assigned to resources % of their time

Posted: 20 Feb 2006 09:29 PM PST

A project produces a specific output. The duration of a project (and the
tasks within it) is whatever time it takes to produce that output. The more
resources you have and the harder they work, the less time it will take to
produce that output with the rare exception of physical processes that take
a specific time, like the time it takes concrete to harden. The planning
process is one intended to help you get the required output completed in the
shortest time and lowest consistent with the quality objectives you need to
achieve.

Notice that my focus here is on the output. You don't start with a defined
block of time - 3rd quarter of 06, for example - and then fill it up with
activity. Instead you start with the knowledge that you have to generate a
marketing plan that involves shooting 6 30-second TV commecials, placing
weekely ads in 15 national magazines, and hosting a customer appreciation
conference in the Bahamas. When you sit down with project, you're seeking
to answer the question "If I start the whole process next next Monday, when
should I tell the production company to start shooting the 4th ad in the
series, when should I schedule the meeting with the ad agency to finalize
selecting the photos for the print campaign, and what dates do we need to
reserve at the hotel in the Bahamas?" When you input what is essentially
the flow chart of the process of the campaign along with your estimates of
how much work each step of the process will require, MS Project calculates
those dates for you. Note that the purpose is not to doent dates that
are predetermined. Rather it is to compute dates that are NOT yet known.
You have certain targets that are known, true enough, but Project's job is
not to list the targets, it's to help you figure what concrete steps you
must take to achieve those targets.

HTH
--
Steve House [MVP]
MS Project Trainer & Consultant
Visit http://www.mvps.org/project/faqs.htm for the FAQs



"Reb T" <microsoft.com> wrote in message
news:com... 

How to retrive Calendar variantions from Microsoft Project

Posted: 20 Feb 2006 04:57 PM PST

Thank You John for acting on it so quick.
sorry for the insufficient information.
i am taking to the Microsoft objects using its disinterfaces. or
fvMSApplication := CreateOleObject('MSproject.Application');
ie. i am not getting data from database or xml.

My application has the similar objects as in the microsoft project. I
am populate my objects properties with Microsoft Project Objects
properties.
The application is really fast when i am getting project, task,
resource objects and its properties. but when it comes to the Calendar
object to get Variations to it i have to go thought loop which checks
if the day is different than the regular wroking calendar hours:

the loop is something like this:


LIDiff:=
DaysBetween(LMicrosoftProjectStartDate,LMicrosoftP rojectStopDate);

for Ly:= 0 to LIDiff+1 do
begin
LDate:= LStartDate;
LDayOfTheWeek:= DayOfTheWeek(LDate);
DecodeDate(LDate,LStartOfYear,LStartOfMonth,LStart Ofday);

LvDay:=
LvMicrosoftCalendar.Years[LStartOfYear].Months[LStartOfMonth].Days[LStartOfday];

{--Add Holidays--}
AddVariationIfMSDayIsHoliday(LvDay,LDayOfTheWeek,L Date); //This
function checks if the day is working or not
{--Add Exceptinal Working Days--}
AddVariationIfMSDayIception(LvDay,LDayOfTheWeek ,LDate); // This
function checks if the wroking day has differnt shift timings

LStartDate:= LStartDate + 1; //increment Date

end;

And to get working time information i am getting it by accessing
Microsoft SHIFT object from the Microsoft Day object.

Although this loop works but it takes tremendous amout of time as
every resorce also has calendar variations or exceptions and i need to
get them as well.
Thank again for your time.
I am only a junior programmes so in case if i have described something
wrong please let me know.

Thanks.
Gaurav

Printing Gantt on Multiple Pages

Posted: 20 Feb 2006 12:45 PM PST

I don't think this is possible, sorry.

--
Jan De Messemaeker, Microsoft Project Most Valuable Professional
http://users.online.be/prom-ade/
For FAQs: http://www.mvps.org/project/faqs.htm
"allison" <microsoft.com> schreef in bericht
news:com... 
the 
from 
what 
on 
the 
GREATLY 


Microsoft CRM - Convert all incoming emails

Microsoft CRM - Convert all incoming emails


Convert all incoming emails

Posted: 20 Oct 2005 06:30 AM PDT

Do you know how to do this? If so, can you please provide me with some
directions?

Thank you!!

"cc" wrote:
 

sales for Outlook - requirements

Posted: 20 Oct 2005 04:27 AM PDT

thanks for your quickly reply.
Now I must change Operating system , because more than one laptop have WXP
home edition

thanks for all
--
Benito Rosado
Milano, Italy


"Arne Janning" wrote:
 

Help please - Another email router problem!!

Posted: 19 Oct 2005 01:10 PM PDT

Were they all configured at the same time? Exchange caches some of these
settings and you may need to cycle the server for it to pickup a setting
change for the users. Other than that, I don't know.

--

Matt Parks
MVP - Microsoft CRM


"Isil" <microsoft.com> wrote in message
news:com...
Matt,

Thank you for your quick response but yes, I have added CRMEMailEnable
setting to their exchange profiles. Any other ideas?

Thanks
Isil

"Matt Parks" wrote:
 
in 


One Activity Record - Two 'Owners'

Posted: 19 Oct 2005 05:44 AM PDT

Thanks, Dave - appreciated.

Cozy

"Dave Carr" wrote:
 

Enquiries on MS CRM

Posted: 18 Oct 2005 06:43 PM PDT

Hi,

As Matt sayd you cannot create many-to-many relationships in CRM. There are
some 3rd party tools which allow customers to do this (with some
limitations). Check out the tools of C360 or Salentica. But you won't be able
to report on these relationships using Crystal Reports (you should be able to
do so with Sql Reporting Services).

I hope this helps,
Rob Bakkers,
Avanade Netherlands


"Johnson" wrote:
 

where is MSCRM 3.0?

Posted: 18 Oct 2005 06:24 PM PDT

I just got an email for MS that said Oct 24th is the new beta release date.

Chris

"dbj" wrote:
 

Changed administrator password now I can't login

Posted: 18 Oct 2005 04:26 PM PDT

The account is not locked and the password never expires. My administrator
account was probably used when CRM was installed (was around for that). Does
CRM request a user account during the install process? If so, then my
administrator account was probably used and since I changed it's password CRM
is not working right.

Microsoft CRM 3.0 - Is it multi-currency?

Posted: 18 Oct 2005 05:13 AM PDT

Nigle, One of my clients has been very happy with Experlogix.
http://www.experlogix.com/

In addition to handling multi-currency (quoting, opportunities too),
they also handled their custom requirement to do discounting at the
opportunity level, AND they make it MUCH easier to select multiple
products (probably save a dozen or more clicks per product add) by
letting you create one page where you can select all of your products
(you first select the category, then products can be grouped by
'service, warranty', etc.)

And the support has been good, too. HTH,

Dave

-------------------------------------------------
David L. Carr, President
Visionary Software Consulting, Inc.
Main #: 971-327-6944

NEW! VAST 1.2.5 featuring VAST Insights for Microsoft CRM! Now, VAST
audits all changes, but also gives you easy query capability into that
historical data!
For informative screenshots, please see
http://www.vscrm.com/screenshots.htm.

Customer Service with MS CRM

Posted: 18 Oct 2005 03:49 AM PDT

Rap,

The CRM 3.0 workflow tool is better, but it will still take a fair
amount of work to make it 'redirect to alternate paths after
diagnostic'. As you can now customize activities in 3.0, you should be
able to add expense tracking information to a task, e.g..

If you need to "keep a precise track", then you'll need VAST (Visionary
Audit System Tools, keep track of all changes made to incidents, etc.).
(By the way, VAST 1.2 is available until CRM and VAST 3.0 are released
for just $99/user, including 1 yr. maint.)

The web is still pretty much an unknown. Some ISV's have created web
portals, but MS has never publicly talked about the licensing issues.
Hopefully, that will be part of the long awaited 3.0 pricing
announcement... HTH,

Dave


-------------------------------------------------
David L. Carr, President
Visionary Software Consulting, Inc.
Main #: 971-327-6944

NEW! VAST 1.2.5 featuring VAST Insights for Microsoft CRM! Now, VAST
audits all changes, but also gives you easy query capability into that
historical data!
For informative screenshots, please see
http://www.vscrm.com/screenshots.htm.

CRM Privilege Error

Posted: 18 Oct 2005 02:14 AM PDT

If you have access to partnersource, there is a KB article with steps to fix
this. THey say it is caused by the user account does not have Local
Activation permission on the CrmBulkMailService DCOM object. The article is
at
https://mbs.microsoft.com/knowledgebase/KBDisplay.aspx?WTNTZSMNWUKNTMMYKOYVTOLQWXPSLWRZZXZ QYZUQUYNULQWNMZKMMNPQUQLNPVRTTXVNONULVNXOYZVSPUTLR TQYOZLQQTQZ


--
Matt Wittemann
http://icu-mscrm.blogspot.com


"Ian Kelsall" wrote: