Pages

Search

Bandwidth utilization when send bulk emails - Microsoft Exchange

Bandwidth utilization when send bulk emails - Microsoft Exchange


Bandwidth utilization when send bulk emails

Posted: 24 Aug 2004 07:36 AM PDT

OK, thanks.
I'll set it up and test it.
 
bandwidth. Breaking 
crawl but 
if you don't 
sluggish 
mine and 
exclusive 
over 
take 
out 
128down 
mails 

Catch all mailbox.

Posted: 24 Aug 2004 02:30 AM PDT

Hi Chris,

I posted my finding while you were obviously sending me
your answer. The article you sent me looked a lot more
in depth. Does that mean that it's any more
robus/reliable?

Thanks for you help on this one.

Reg 
detailed in this Microsoft 
us;324021 
utility) 
and 
to 

How to add a disclaimer to outgoing SMTP messages?

Posted: 24 Aug 2004 01:41 AM PDT

thanks
 
<com> wrote: 
messages 
er_Text_With_The_IMS_Extension_In_MS_Exchange_55.h tml 

Exhange Implementation

Posted: 23 Aug 2004 12:20 PM PDT

Hi,

Your first port of call should http://www.microsoft.com/exchange, on there
you'll find the system requirements for Exchange 2003. There are also
documents and links on there which will you point you towards sizing
guidelines.


Kind Regards,
Rob Wilcox
Microsoft Exchange Specialist Support Engineer
This posting is provided "AS IS" with no warranties, and confers no rights.

help for noob

Posted: 23 Aug 2004 06:35 AM PDT

Thanks very much to you both for your info I shall get on with trying the
POP3 I think as it's only emails needed.
"Mark Arnold [MVP]" <org> wrote in message
news:com... 


Exchange storage limits

Posted: 23 Aug 2004 04:39 AM PDT

Extract from the book sent to your email address.

"Mark Arnold [MVP]" wrote:
 

move mailbox between exchange servers 5.5

Posted: 23 Aug 2004 04:17 AM PDT

On Mon, 23 Aug 2004 04:17:02 -0700, "Zvika Y" <Zvika
microsoft.com> wrote:
 

I'm guessing that the two domains aren't trusted in any way so the
easiest for you would be to exmerge them from one into the other.
http://support.microsoft.com/default.aspx?scid=kb;EN-US;174197

Save space on Exchange SERVER....

Posted: 19 Aug 2004 06:51 AM PDT

Did you see my reply to your identical post (subject: "just can't seem to
get started") in m.p.exchange.clients? My answer was pretty much identical
to Mark's.

Please don't multipost - if you need to post to multiple groups, it's best
to crosspost instead, by posting a single message to a handful of relevant
groups (separate the NG names with commas) so that everyone can follow the
thread. Thanks :-)

See http://www.blakjak.demon.co.uk/mul_crss.htm


Umar Pirzada wrote: 


Time stamped in SMTP log incorrect

Posted: 17 Aug 2004 01:31 PM PDT

I figured that was the case but is there any way to
change this. This makes it harder to trouble shoot
problems. Other Email programs that I have setup use the
correct time zone.

 
ideas? 

Microsoft Word - headers disappeared from the building block organizer

Microsoft Word - headers disappeared from the building block organizer


headers disappeared from the building block organizer

Posted: 02 Apr 2013 07:42 PM PDT

I have been using a header called Motion for all of my documents in Office Word 2007.  When I came back to the work I was doing this afternoon both the Odd and Even versions of that header have disappeared from the Building Block Organizer.  Does anyone know how I can get that header back?  It's the only one I actually use as it's a fairly basic one.  If I knew how to get a picture in here I could show you what the header should look like.

I have a HP Pavilion a6500f running Windows 7 Home Premium 32 bit.

how to create C5 envelope

Posted: 02 Apr 2013 03:30 PM PDT

I use a C5 envelope, a size that is apparently unknown to Word but one that I have successfully defined to my Canon MG5350 printer. It may not be a standard US size, but it is definitely a European standard, designed to take an A5 sheet without folding.

In all versions of Word that I have ever used I have never found a way to define an envelope of the corresponding name,  size and orientation. Can anyone help?

Is it possible to set the MSO Word ruler to measure in centimeters instead of inches?

Posted: 02 Apr 2013 02:58 PM PDT

I'm working on a design for a label and the agency wants the artwork to a certain specification in centimeters. Word traditionally shows a ruler measuring in inches. Is there any way I can change that?

Label printing not aligned

Posted: 02 Apr 2013 11:55 AM PDT

When I try to print address labels in Microsoft Word, the lines do not line up at the left side.  The second line is indented below the first line and the third line is in front of the first two lines.In other words the lines are neither aligned to the left nor centered nor aligned to the right.

I had to restore my pc to an earlier time and now my word starter and excel starter won't open my files. It says to fix with control panel, but troubleshoot doesn't help.

Posted: 02 Apr 2013 09:42 AM PDT

Past restoring my pc to an earlier time, everything seems to work except I can't open my word or excel documents. How can I fix this. It says to fix at control panel, but troubleshoot won't fix it.

Clicking "Define" Requires Page Refresh

Posted: 02 Apr 2013 04:26 AM PDT

Hi all,

I'm on Word 2013 Professional for Windows 8 64 bit. 

I was enjoying the Merriam-Webster app but it has suddenly caught a little bug. When I click Define to open up the M-W definition in the right side bar, I get a message that says "Navigation to the webpage was cancelled. What you can try: Refresh the page." 

After clicking "Refresh the page," I get an alert that says the following:

There is a problem with this website's security certificate.
 
The security certificate presented by this website has expired or is not yet valid.

Security certificate problems may indicate an attempt to fool you or intercept any data you send to the server.
  We recommend that you close this webpage and do not continue to this website.
  Click here to close this webpage.
  Continue to this website (not recommended).
 
More information
  • If you arrived at this page by clicking a link, check the website address in the address bar to be sure that it is the address you were expecting.
  • When going to a website with an address such as https://example.com, try adding the 'www' to the address, https://www.example.com.

    For more information, see "Certificate Errors" in Internet Explorer Help.



    Sorry about the big text I just pasted that in. I think it might be a McAfee alert? (I'm on a Dell and McAfee came installed, but if so, why is it suddenly acting up? I don't believe I've changed any settings and it was working before). 


    Anyway, if I click ok to give permission and access the page, it then takes me there, but it's a little annoying to have to do this every time. Any ideas how to avoid this alert? If it's a McAfee problem maybe I can white list the page somehow? Or is this a Word issue?  


    Thanks in advance and have a nice day!

  • Change marks missing in Word 2013 (Office 365)

    Posted: 02 Apr 2013 03:10 AM PDT

    In Word 2013/Office 365, when I turn on track changes or perform a file compare, the highlight on the left side does appear, but the actual changes are not marked. There are no underlines or strikethroughs. I have tried changing the colors for these from "By Author" to specific colors, but this had no effect.

     

    Worked fine in Word 2010. I've not yet removed Word 2010 from this computer and it still works fine there.

     

    This seems like a bug, because I experienced this within a day of installing Office 365 and had not made any changes or customizations. On the other hand, I've searched and not found any other reports of this problem. Surely, other people are using Word's Track Changes or file compare features.

     

    Any suggestions? Anything I should try or test?

     

    Thanks,

    Colin

    create a short cut in desk top for word and can't do pretty things with text like I could with 2000

    Posted: 31 Mar 2013 06:28 AM PDT

    just got new computer windows 8 would like to be able to create a short cut in desk top for word

    where in word: can you? find the insert word art that was on office 2000 that made text pretty by changing it shape look like making it horseshoe shaped, narrow becoming wider, going down instead of across

    thank you

    When printing labels, Word 2007 is printing blank pages.

    Posted: 30 Mar 2013 11:07 AM PDT

    When printing circle labels from an Avery Template, Word 2007 is printing blank pages.  In print preview I can see the words/pictures, but when it's printed it's blank.  I just printed regular shipping labels from another Avery Template and they printed fine.  But this template for some reason is printing blank pages.  When I print preview it, I can see the image/words.  When I create a PDF from Word's PDF creator, I can see it, yet it's all messed up.  BUT when I print to my other PDF creator on my computer, it creates a blank PDF.  Any suggestions?  I've tried a bunch of things already that I've read on here, but nothing's worked.

    How do you arc word art in word 2013

    Posted: 29 Mar 2013 09:18 AM PDT

    When I press word art and I type in what I want, there is no way for me or at least I cant find how to shape the phrase into an arc.

    Slow installation of Office 2003. - Microsoft Office forums

    Slow installation of Office 2003. - Microsoft Office forums


    Slow installation of Office 2003.

    Posted: 19 Jul 2004 07:43 PM PDT

    I turned my computer on, it slowed down to a crawl almost so I did the Last Known good configuration, deleted my profile and created a new one, ran Checkdisk then Disk Defragmenter and it still installs very slowly. I might have to try another cd but I'll try it on another computer first.

    "Susan Ramlet" wrote:
     

    Office XP MUI

    Posted: 12 Jul 2004 06:47 AM PDT

    James, perhaps we can help each other.
    I believe in Office XP you can reinstall the office tools - I think they are in a seperate folder on the CD. Try reinstalling them - I think the folder name is add-ins or tools.

    Here is my question to you.
    Where did you find pricing on your MUI license. I am in need of a MUI license for Dutch.
    --
    LCD


    "com" wrote:
     

    how to configure the linux when i change monitor ? - Forums Linux

    how to configure the linux when i change monitor ? - Forums Linux


    how to configure the linux when i change monitor ?

    Posted: 14 Jun 2004 01:17 AM PDT

    Darick <com.sg> wrote: 

    With the 'configuration tools' no (AFAIK), but nothing stops you to go
    to /etc/X11 and modify by hands the XF86Config file. Make a copy before
    messing with it.

    Davide

    --
    | It's a damn poor mind that can only think of one way to spell a word.
    | -- Andrew Jackson
    |
    |

    Resource View Summary Tasks Microsoft Project

    Resource View Summary Tasks Microsoft Project


    Resource View Summary Tasks

    Posted: 25 Jun 2004 01:36 PM PDT

    Thanks John, I could probably do it in MS Access but I was wondering if
    MS Project could do it

    Thanks.....

    John wrote:
     

    Where is email name in MS database schema?

    Posted: 25 Jun 2004 10:21 AM PDT

    Hi BMac,
    In Project 2000 it is the Email Address field. You will
    only have that field available if you are in a resource
    driven view however, such as the resource sheet. You
    will not see the field available in a task driven view
    (such as the Gantt chart or task sheet.)

    Hope this helps.
    Julie 
    (from memory). 
    group. 
    project.server 
    practices and Project VBA 
    email name for a 
    name for the field 

    Two key concepts we need to make our schedule work! Can Project aand the operator do this.

    Posted: 25 Jun 2004 08:22 AM PDT


    John,
    I apologize ahead of time. The answer seems obvious. Skip operations 1
    through 4 and go straight to 5 because the weekend is here. Oh by the
    way, make sure the resource is readily available :-)

    John

    changing default time?

    Posted: 25 Jun 2004 08:15 AM PDT

    Are you certain that you're changing to correct calendar when you try
    manually? The calendar that is designated as the Project Calendar (Project
    Information screen) is the one that governs tasks that have no resources
    assigned while the calendar designated as the base calendar for the
    resources is the one that will govern, vie the resource calendar, for tasks
    that resources have been assigned to them. Did you highlight all the column
    headings to change the hours for all dys of the week or did you only update
    one day's working time? (That's incredibly easy to do if you're distracted,
    happens to me all the time LOL)


    --
    Steve House [MVP]
    MS Project Trainer/Consultant
    Visit http://www.mvps.org/project/faqs.htm for the FAQs


    "dion" <microsoft.com> wrote in message
    news:216c701c45ac7$3ad7f600$gbl... 


    So many questions...so little time...on scheduling and leveling

    Posted: 24 Jun 2004 03:41 PM PDT

    + First, thanks for taking the time to sort through the mess. I take
    your point about taking a class. Is there something online or a good
    book you could recommend to me?
    ----------------------------------------------------------------
    Some basics: Project 2003 on XP. All tasks are Fixed Unit ASAP. All
    dependencies are either FS or FF. All Resources have start dates but
    NA for end dates. Scheduling based on Start Date. No assignments to
    summary Tasks.

    How can I specify a minimum assignment interval for a project? Say 1
    hour?

    * What is an assignment interval?

    + I want it to not split a task into intervals of less than 1 hour.
    I'm looking for a way around the rounding problem mentioned below.

    Can I assign 2 people to one task without requiring them to work
    together every minute? I'd like to set a time window (say, a 5 day
    period) during which they're scheduled for 1 day each, but the
    specific times do not have to match.

    * Have you tried Project? What youask for is normal berhaviour, it's
    keeping them synchronous that is nearly impossible :-))

    + Perhaps there's a setting that controls it? ALL my joint tasks are
    synchronous after leveling. I've resorted to creating one
    task/resource to get around it. One possibility is that I enter
    everything as Work not duration. Bad idea?

    What causes Project to allocate 100s of thousands of percent to a
    Resource when leveling?

    * I wouldn't know, because I have never seen leveling change
    assignment units.

    + The weather's actually fine over here in the twilight zone. It's a
    good thing because the birds ate my bread crumbs so I'm having trouble
    finding a way home.

    What causes Project to decide to schedule some tasks in 2049 when
    leveling? (Note basics above.) I've read about reasons that Project
    has for doing this, but I don't think they apply in my case.

    * Of course they will apply, a software always obeys to its own
    rules.Reasons are using availability dates for resources or assigning
    resources to summary tasks.

    + I checked for those situations. (I mention this at the top.) I do
    use availalability dates, but I use only start dates. The end dates
    are always NA. I can often get around this by playing with the order
    in which I level (and relevel) individual resources or by changing
    leveling options (ID order seems to avoid the problem the most often.)
    Is there a way to tell it to stop leveling if it can't fit everything
    in by a certain date? (My project is scheduled by start date.)

    What causes Project to set Work to 0 for some groups of tasks when
    leveling?

    * Again, I have never seen leveling change work. Are you sure there is
    not a VBA macro that runs before leveling ? I once did that for a
    customer.

    + Not unless Project itself runs such a macro.

    Is there any way to give Project a threshhold when leveling so that it
    would consider an x% overallocation close enough and keep going?

    * Yes, give the resource a max. units of 100+x%

    + Thanks.

    Why does Project leveling assign 7.98 hours to the first day of a 3
    day task, when the task has only 1 resource assigned, and the resource
    has no other assignments on that day?

    * You could try FAQ 5. Default Workiing hours on
    http://www.mvps.org/project/faqs.htm Another possibility is that a
    predecessor ends a few minutes into the day Finally I have to admit
    that leveling doesn't always round decimals correctly.

    + Rounding and maybe more. I've now found cases when it allocates <15%
    of a workday...My workaround is to delete and readd the task. That
    seems to cure it.

    When I apply the "Critical" filter in Gantt, Project shows only tasks
    in the final three months of the project. Does this mean that no
    individual task is critical before that time? (That there are multiple
    paths that prevent an earlier finish date?)

    * No. It means what it shows, that no tasks are critical at all. You
    must have a constraint somewhere in the middle, in such a way that
    tasks inthe arly stages of the project do not influence end date at
    all.

    + Thanks.

    When you assign two resources to one task, both at 100%, why does Work
    sometimes show slightly (8.03 vs 7.97) different values on Tracking
    Gantt and Resource Usage?

    * I do not know. I should see the file.

    + I suspect rounding again. My fix is to delete and reenter the task.

    What does an assignment of 0h mean and why does leveling create them?

    * Again, I have never seen Leveling create assignments

    + Struggling a bit with terminology. I look on Resource Usage and I
    see cells with 0hrs there (followed and/or preceded by non-zero
    cells.) Is "split" the correct term?

    What does it mean to assign a resource to a summary task while leaving
    the detail tasks unassigned?

    * That it will work on that summary task for the whole duration of the
    summary task (independently of whether there are detail tasks at
    certain dates or not)

    + Thanks.

    When you enter a work # on a task with multiple resources, why does it
    divide the work # by the # of resources? And why does it not do so if
    you reenter the #?

    * I rarely answer Why questions, I cannot look into the head those who
    wrote the specs.

    Why are the IDs sometimes out of sequence in Tracking Gantt view?

    * BecauseYOU sorted the view.

    + This is a little different. I drag a task to a different spot in the
    outline, and it retains its old ID. The worst case is that I drag a
    task to another spot, then drag a second task to another spot, and the
    first dragee jumps back to its original place. Also, sometimes the
    predecessor field retains an obsolete ID # after you move the task to
    which it refers. The latter problem resolves itself with a little
    jiggling.

    New ones.

    + Project repeatedly (but not always) sets Work to 0 for certain tasks
    when leveling. Any pointers?

    + My leveling strategy goes like this:

    S1) Clear leveling for the project.
    S2) Go to Resource Usage.
    S3) Sort Resources by descending Work.
    S4) Level Resource 1. Skip All.
    S5) Level the busiest overallocated Resource other than the Resource
    you just leveled. Skip All.
    S6) Repeat S5 until overallocations go away.

    Leveling settings: Hour by Hour. Do not clear. Entire project. ID
    order. Ignore slack. Do not adjust individual assignments. No splits.

    If I vary from this routine, I usually get 2049 problems. One way that
    often corrects 2049 problems is to clear leveling on just those tasks
    that finish in 2049 and relevel.

    I appreciate your suggestions!

    Summary tasks from Project To excel

    Posted: 24 Jun 2004 09:26 AM PDT

    A.Outlineparent.outlineparent.name
    HTH
    --
    Jan De Messemaeker
    Microsoft Project Most Valuable Professional
    http://users.online.be/prom-ade/index.htm
    32-495-300 620
    "Esperanza" <com> schreef in bericht
    news:google.com... 
    news:<microsoft.com>... 


    Project statistics

    Posted: 24 Jun 2004 09:24 AM PDT

    Hi Pops,

    I apologize. Terminology confusion on my part, I thought
    you were talking about Project|Project Information|
    Statistics, not File|Properties|Statistics.

    The only way I can discover what I think you are looking
    for is to do as Gerard Ducouret suggested in his post.
    Save the project file as a template file. [File|Save As|
    change the file type to template]. Then when you choose
    file|New and base the new file on the template, your file
    properties are "re-set."

    Sorry again for the misdirect. Hope this helps.

    Julie 
    or 
    modify 
    open 
    schedule. 
    better 

    Exporting into Excel

    Posted: 24 Jun 2004 08:47 AM PDT


    Mark,
    In answer to your second question there is not an option per se for
    copying gantt chart graphic information. However there are several ways
    to get there. One way, although I've never tried it, is to save the
    gantt chart view as a web page. I'm not sure exactly what it does with
    the graphic, but you might want to read about it in the Project help
    file and give it a try.

    A second method that is often used is to capture the gantt chart view as
    an image using the 'copy picture' (little camera) icon. With this method
    you have to try different screen formats to get the image as you want it.

    Another method, if you have the full Adobe Acrobat version, is to save
    the file as a .pdf. You won't be able to manipulate it but the whole
    file is captured.

    Yet another method is to use a VBA macro to effectively replicate the
    graphic features of each task in the Gantt Chart. This method can be
    used in Excel, PowerPoint, or Word. It does give you control of the
    image, but requires some VBA expertise.

    Hope this helps.
    John

    Allow Project to set Units

    Posted: 24 Jun 2004 08:45 AM PDT

    Hi Jan,
    I was affraid of that. As far as Maximum
    Availability, that is the reason I was hoping Project
    would do this. We have a large base of Engineers that we
    are working with and the Program Manager wants to know if
    he needs to put in a request to have X number of them
    transfered off their current projects to fulfil the need
    or do we need to hire additional engineers, and how
    many. I think, as you questioned below, I am going to
    have to take it one task at a time and adjust how many
    are working on each task to manipulate the date.
    I can look at my Resource Sheet and see my "Peak"
    units. If I adjust my Max units to equal my peak units
    and then level, all it does is say that no-one is over
    allocated, it does not adjust my date. If I add more
    units than my peak and then level, it just says that we
    have people under utilized. I guess I will have to do it
    by hand.

    Thanks for your input.

    Shaun 
    right, but I have some 
    By the same factor? 
    bericht 
    of 
    The 
    the 
    finish 

    Editable calculated custom field in project

    Posted: 24 Jun 2004 08:35 AM PDT

    No you can not, but if the value is a static value, you don't need to.

    Simply use a value list.

    select the column header
    right click
    select customize fields
    click on the value list button
    enter the value you want as default
    check the "Use a value from the list as the default..." box.
    Select the value
    Click the set default button
    check the "allow additional items to be entered into the field" button.
    click OK.

    Now if the value must be calculated you have to use two fields
    Use Text1 for the user to enter a non-default value.
    Use Text2 with a formula like this:

    iif([Text1]="",(put your formula here),[Text1])

    That way if text1 is blank it uses and displays the result of your formula,
    and if text1 is not blank it uses and displays the value of text1.

    -Jack

    "Gabriele" <it> wrote in message
    news:google.com... 


    setting defaults

    Posted: 24 Jun 2004 08:17 AM PDT

    Hi Julie,

    Funny version of Project you seem to have - I have always known that the
    setting of Date Format under Tools, Options, View spreads through the whole
    computer (even when you have multiple Global.mpt files) so the answer to
    your question is: to achieve that, do nothing. Project does it all for you.

    --
    Jan De Messemaeker
    Microsoft Project Most Valuable Professional
    http://users.online.be/prom-ade/index.htm
    32-495-300 620
    "JulieD" <net.au> schreef in bericht
    news:phx.gbl... 
    it 


    Fill Colors for Project Fields

    Posted: 24 Jun 2004 07:59 AM PDT

    I don't know, but I have asked for it :) Why not send them a wish?


    Mike Glen
    Project MVP


    "Al Wallace" <microsoft.com> wrote in message
    news:com... 
    I guess I was hoping for some backdoor/magical incantation ;) Do you know
    if MS plans to add this feature to make this product more consistent with
    the rest of the MS Office suite? 
    Select 
    seen at 
    discussion 
    they 


    Project Resource Dependencies

    Posted: 24 Jun 2004 07:46 AM PDT

    "Al Wallace" <microsoft.com> wrote in message news:<com>... 
    was that if Fred was the only one working the tasks, I didn't want him
    to bounce back and forth between them. Leveling is not what I want to
    do. I want to find a way (if one exists) for Project to identify the
    resource dependencies so that I can try to apply other/different
    resources. Leveling doesn't do that. I want to compress my schedule,
    not extend it.

    But that is exactly what Project is showing you on the Resource Usage
    view. The resources in red are overallocated. Look through their
    assignments, and the timescale view on the right side of the screen
    will show you which tasks overlap and when. These are the tasks you
    should find another resource for, or you could manually level by
    adjusting the scheduled work in the timescale part.

    Sarah
    sarah_kiko@(removethis)cinfin.com

    Custom project report/analysis

    Posted: 24 Jun 2004 07:13 AM PDT

    Hello,
    I downloaded the tool bar and didn't have any problems.
    Have you displayed the toolbar? 
    tool 
    of 
    predefined 
    in 
    of 

    unchecked Project

    Posted: 24 Jun 2004 06:55 AM PDT

    Zimmermann --
    Zimmermann --

    If your PC crashes while you have a project open, it will remain in a
    checked out state until someone checks it in. If you are using Project
    Server 2002, your Project Server administrator is the only one who can check
    it in for you. If you are using Project Server 2003, you can check in your
    own project on the Project Center page or you can have your Project Server
    administrator check it in for you. Hope this helps.

    --
    Dale A. Howard [MVP]
    Enterprise Project Trainer/Consultant
    Denver, Colorado
    http://www.msprojectexperts.com
    "We wrote the book on Project Server"


    "Zimmermann Christian" <hevs.ch> wrote in message
    news:cbgr0a$i56$ip-plus.net...