resource allocation - newbie question Microsoft Project

resource allocation - newbie question Microsoft Project


resource allocation - newbie question

Posted: 14 Mar 2005 09:17 AM PST

Hi Jo,

Try Tools>Level Resources. Make any desired changes within the dialog box
and click the Level Now button.

Hope this helps. Let us know how you get along.
Julie

"Jo" wrote:
 

How can I place a watermark such as "Draft" in a MS Project Plan?

Posted: 14 Mar 2005 09:05 AM PST

Hi Bobm,
You're welcome and thanks for the feedback.
Julie

"Bobm" wrote:
 

problems with actuals

Posted: 14 Mar 2005 03:43 AM PST

Hi Jan,

In the actual column, I see 0 everywhere. When I go to the ressource usage
view, I see that the protected actals a re correctly positionned.

We have resolved the problem by restoring from backup the specific project.
I suspect that the project manager did some "weird" copy-paste anyway from
another project.

Thanks for your attention
Fred

"Jan De Messemaeker" wrote:
 

HAVE A PRODUCT KEY NUMBER THAT DO NOT ACTIVATE MY OFFICE PACK..WH.

Posted: 13 Mar 2005 03:19 PM PST

Costco has a reasonably decent warranty policy. Best bet is to call the
store where you bought the computer or the manufacturer if the computer is a
name brand.
--
Steve House [MVP]
MS Project Trainer & Consultant
Visit http://www.mvps.org/project/faqs.htm for the FAQs


"COM" <microsoft.com> wrote in
message news:com... 

Earned Value Analysis--Physical % Complete Values

Posted: 12 Mar 2005 06:35 AM PST

Hello Tim,
You can't, (without any personal formula)
The only use of the Physical % Complete is to alter the calculation of the
BCWP if you allowed this in Tools / Options / Calculation / Earned value /
Default Earned value method : Physical % Complete.
This BCWP will roll-up to the sub-summary or project !

Gérard Ducouret

"Tim from Minnesota" <Tim from microsoft.com> a écrit
dans le message de
news:com... 
project 


Trouble with dependencies in Project 2003

Posted: 11 Mar 2005 01:49 PM PST

Hi Laura,

The "Actual Finish column you inserted, is that a date column you are
entering the date in?

There is an Actual Finish field in project where you should be recording the
Actual date the task is finished. That will push out the successor tasks as
you need. Choose Insert>Column and in the field list, select Actual Finish.
(You may want to check out the Tracking Table as well. It contains Actual
Start, Actual Finish and a number of other tracking fields.)

Hope this helps. Let us know how you get along.

"Laura" wrote:
 

Which two tool bars are displayed as default in Microsoft word

Posted: 11 Mar 2005 12:49 PM PST

There are three toolbars displayed at startup by default in a freshly
installed copy of Word, not two. Sounds like a question from school - why
are you expecting us to do your homework for you? You only learn if you do
the research yourself.
--
Steve House [MVP]
MS Project Trainer & Consultant
Visit http://www.mvps.org/project/faqs.htm for the FAQs


"Nyaradzo" <microsoft.com> wrote in message
news:com... 

Earned Value calculation by Physical % complete ...

Posted: 11 Mar 2005 11:23 AM PST

Hello,

Check also if you allowed this in :
Tools / Options / Calculation / Earned value / Default Earned value method :
Physical % Complete

Gérard Ducouret

"Project Slave" <microsoft.com> a écrit dans le
message de news:com... 
schedule, 
realized 
taks 
of