Is Project Server Needed for Sharing? Microsoft Project

Is Project Server Needed for Sharing? Microsoft Project


Is Project Server Needed for Sharing?

Posted: 16 Feb 2005 12:56 PM PST

Thanks guys, for the info and such a quick response. Does Project
support any means of being used remotely? Or is that also something that
requires the server (i.e. a web client)?

Brian

JackD wrote: 

Display non-dependent external tasks?

Posted: 16 Feb 2005 12:05 PM PST

In article <googlegroups.com>,
com wrote:
 

Dave,
Yes, but how brave do you feel? One method is to use Paste Links between
the source and external files. However this method is fragile and if the
files and links are not handled carefully, corruption can occur rather
easily. To set up a Paste Link, do a copy of the milestone Finish date
in the source file. Then open the destination file(s), select the Start
date of the replicated milestone in the external file and go to
Edit/Paste Special. Select the Paste Link option and hit "OK". Now save
the Source file and then the destination file(s). That's the easy part.
To avoid corruption, after each update, save the source and then the
destination. Also, do not move either file to a different location. It
may also help to cross the pinkie and third finger on the left hand
whenever the linked files are active.

I think a much better bet is to create a master with the external files
as subprojects and then use external predecessors to tie the milestones
together.

Hope this helps.
John
Project MVP

adding resources

Posted: 16 Feb 2005 08:42 AM PST

Hi,

You can Contour resource usage per task in either the Task Usage or the
resource usage view.
HTH

--
Jan De Messemaeker
Microsoft Project Most Valuable Professional
http://users.online.be/prom-ade/index.htm
32-495-300 620
<com> schreef in bericht
news:googlegroups.com... 


resource pool data is getting duplicated

Posted: 16 Feb 2005 08:41 AM PST

Hi Daniel,

Welcome to this Microsoft Project newsgroup :)

You might like to have a look at my series on Microsoft Project in the
TechTrax ezine, particularly #17 - Multiple Projects, at this site:
http://tinyurl.com/2xbhc or this:
http://pubs.logicalexpressions.com/Pub0009/LPMFrame.asp?CMD=ArticleSearch&AUTH=23
(Perhaps you'd care to rate the article before leaving the site, :)
Thanks.)

FAQs, companion products and other useful Project information can be seen at
this web address: <http://www.mvps.org/project/>

Hope this helps - please let us know how you get on :)

Mike Glen
MS Project MVP



Jan De Messemaeker wrote: 


HELP!! -- Calendar Formatting

Posted: 16 Feb 2005 07:43 AM PST

Hello AnonyMouse,

Question 1 : Definitely No ! (sorry)
Question 2 : AFAIK, that's No also (sorry again)

Gérard Ducouret

"AnonyMouse" <org> a écrit dans le message de
news:%phx.gbl... 



display the note column

Posted: 16 Feb 2005 07:35 AM PST

you're welcome and thanks for the feedback

"Paul" <microsoft.com> wrote in message
news:com... 


Project 2003 - Howto save as XML (to pass on to Project user)

Posted: 16 Feb 2005 07:09 AM PST

While surfing the 'net, "Gérard Ducouret"
<fr> wrote:
 

That 's all ?!

His boss told me that their company was running Project 2003, but I
wonder if he has an older version. He swore that there wasn't an
option to save as XML and that he couldn't find it in Help or manual.

I need to check this out...

Merci!
Dave
--
Spam = Theft
Any Questions?

----== Posted via Newsfeeds.Com - Unlimited-Uncensored-Secure Usenet News==----
http://www.newsfeeds.com The #1 Newsgroup Service in the World! 120,000+ Newsgroups
----= East and West-Coast Server Farms - Total Privacy via Encryption =----

tasks with same start & end date

Posted: 16 Feb 2005 06:37 AM PST

julie,
perfect !
thanks.
andy

"JulieD" wrote:
 

Calendar icon in indicator field

Posted: 16 Feb 2005 06:05 AM PST

Hi Gérard:
Thanks for your reply. I was hoping to set the default task calendar to
Standard/w Holidays and just display variances from the default, not NONE in
the indicator field. My work-a-round is to set the default resource calendar
to Standard/w Holidays and change the task calendar sparingly.

Jim

"Gérard Ducouret" wrote:
 

Gnatt Chart Timescale

Posted: 16 Feb 2005 03:23 AM PST

Paul,
Did you set these non-working days in a specific calendar ? (Tools / Change
working time...)
If so, do the following :
Format / Timescale / Non-working time
Calendar : in the drop-down list, select the calendar you want to display

Gérard Ducouret

"Paul" <microsoft.com> a écrit dans le message de
news:com... 
off, 
below? 


Graphical Indicators in Project 2000

Posted: 16 Feb 2005 01:13 AM PST

You are welcome, Carpy

Gérard

"carpy" <microsoft.com> a écrit dans le message de
news:com... 
of 
de 
wrong 
and 


How can I export a Gantt Chart to Word?

Posted: 15 Feb 2005 08:01 PM PST

Hi P Wong,

Welcome to this Microsoft Project newsgroup :-)

Please see FAQ Item: 16. Project Viewer.

FAQs, companion products and other useful Project information can be seen at
this web address: http://www.mvps.org/project/

Hope this helps - please let us know how you get on :-)

Mike Glen
Project MVP



P Wong wrote: 


How do I open a file with extension .MXM?

Posted: 15 Feb 2005 06:09 PM PST

In addition, this file must be installed on each computer that will be
using the Workgroup, not just on the one where the MS Project plan is
managed. The resources who will be providing email updates need to have
it installed so that their systems will recognize the files sent from
Project.

SarahK

Rounding in Project 2000

Posted: 15 Feb 2005 04:13 PM PST

In article <com>,
"Phuong Nguyen" <microsoft.com> wrote:
 

Phuong,
You're welcome.

John

Duration3-duration 2 = how do I format in days?

Posted: 15 Feb 2005 03:41 PM PST

Thanks for the quick reply -- works great!

"JackD" <momokuri@gmail> wrote in message
news:phx.gbl...